Rockwell Automation 5370-CVIM2 Module User Manual

Page 21

Advertising
background image

5

Chapter

Chapter 1

Hardware Connection and Powerup Check

1–9

Figure 1.3 Example: Monitor Screen After Normal Powerup

Main menu

bar

If you have not yet installed the CVIM2 system at its factory–floor site, refer
to the following Allen–Bradley manuals:

Pyramid Integrator Installation Manual, Publication 5000–6.2.10.

Grounding and Wiring Guidelines, Publication No. 1777–4.1.

Solid–State Control Safety Guidelines, Publication No. SGI–1.1.

These manuals contain all the information required for panel– or
rack–mounting, electrical grounding, and connecting to the I/O components.

You will have already performed in this chapter some of the steps described
in the PI installation manual. When you encounter one of those steps, verify
that you have performed it correctly, then continue.