Cvim2 configuration: four basic phases – Rockwell Automation 5370-CVIM2 Module User Manual

Page 25

Advertising
background image

Chapter 2

CVIM2 System Configuration: An Overview

2–2

Figure 2.2 is a chart showing four basic phases that are involved in
configuring the CVIM2 system for a typical inspection application. Many
details are intentionally omitted in order to emphasize the overall picture of
the system configuration process.

Figure 2.2 Basic Phases of CVIM2 System Configuration

Observe and evaluate

inspection operation

and tool results

Discrete I/O Editor

:

Name I/O signals, and

assign input and output

functions

Enter inspection

names

Configuration Editor:

Select tool names,

and configure all

inspection tools

Evaluate tool

operation offline

in setup mode

Pick

Setup

to enter

toolset editor

Main menu bar:

Pick

Environment

Environment

menu:

Pick

On–Line

Begin online

inspection

operations

Configure
inspection

Select

discrete I/O

parameters

Phase 2

Phase 3

Phase 4

Acquisition Editor

:

Adjust tools if

necessary

Configuration

File Editor:

Select

configuration

names

Phase 1

Enter configuration

file name

Enter acquisition

configuration

file name

*Enter message

file name

Enter discrete I/O

file name

Select image

acquisition parameters

*Refer to the CVIM2 Communications Manual, Pub. No. 5370–804, for details.

CVIM2 Configuration: Four
Basic Phases

Advertising