2 post-processed kinematic survey (rover) – Leica Geosystems GPS System 500 - Technical Reference Manual User Manual

Page 167

Advertising
background image

167

7. Measuring with System 500

Technical Reference Manual-4.0.0en

7.2 Post-processed Kinematic Survey (Rover)

Set up the equipment as described in
Chapter 2. Attach the Terminal.

Switch on. The Main Menu will be
displayed. The system will
automatically start searching for
satellites.

Select Survey and press CONT (F1).

Config Set - Defines the
Configuration Set to be used. The last
Configuration Set used or created will
be taken by default although any
other Configuration Set may be
selected.
Job - Defines the Job to be used.
This is the Job where any point and
observation data will be stored.

Coord Sys - Displays the coordinate
system that will be used for the
display of coordinates. For post-
processed work, this will normally be
WGS84.

Antenna - Defines the Antenna setup
to be used. The Setup defined in the
Configuration Set will be taken by
default although any other setup may
be selected. For post-processed
Kinematic work, this will normally be
AT501/502 Pole.

Press CONT (F1) when you have
made your selection.

Enter the data and press STORE
(F1). The data will be stored with a
time tag. During long observation
periods you may need to store
several sets of meteorological data as
the weather changes.

Advertising