Leica Geosystems GPS System 500 - Technical Reference Manual User Manual

Page 224

Advertising
background image

224

7. Measuring with System 500

Technical Reference Manual-4.0.0en

The Slope Line is defined and se-
lected. Proceed along the line. You
can ensure that you keep on the line
by observing the Left/Right value and
keeping it at or near zero. Observe
the Cut/Fill value. At the intercept(s) it
will be zero. When you arrive at such
a point, stake it and record it.

Procedure
Slope
is selected as the Stake Type
when entering Stake-Out.

The “as staked” points will always be
stored in the Store Pts Job. If staking
from an ASCII file, you may also
choose to store the Target points
defined there in the Job. In this way
you have the Target points and the
“as staked” points in one Job.

To start Slope Stake-Out, press
CONT (F1).

Stake-Out starts. Orient is along the
Slope Line only . Details about using
Lines as orientation are given in
section 7.5.4.

The measurements In/Out, Right/
Left and Cut/Fill are given with
respect to the start point of the line.

When you reach the required point
place the stake.

To record the point, press OCUPY
(F1).

Advertising