9] position 2 operation circuit, Moving complete startup – IAI America ERC3 User Manual

Page 426

Advertising
background image

Chapter 10

Appendix

10.5

Example of Basic Positioning Sequence (PIO Patterns 0 to 3 in PIO Converter)

416

[9] Position 2 Operation Circuit

The main circuit is designed to process and manage signals “start” o “moving” o “positioning

complete” to move the actuator to position No.2. This circuit indicates the same sequence as

that of position No.1.

STA R TL

RC Start

Displa

AUX11

Position 1

Positioning

Complete

AUX4

Completed

Position 1

099

OUT1

AUX12

105

IN13

OUT1

AUX13

111

OUT1

AUX14

b096 a101 a132

b137 a142 b152

a163

Auxiliary Position 2

Positioning Start

AUX12

Auxiliary

Position 2

Positioning Start

Auxiliary

Position 2

Positioning

Start

STA R TL

RC Start

Display

AUX12

AUX14

Position 2

Positioning

Complete

PEND

Point

Positioning

Completion

a102 a107 a 111

Position 2 Positioning

Start Check

AUX13

Position 2

Positioning

Start Check

STA R TL

RC Start

Display

AUX13

AUX5

AUX15

b108 a 113 a 117

Position 2

Positioning Complete

AUX14

Auxiliary

Position 3

Positioning

Start

Position 2

Positioning

Complete

Position 2

Positioning

Start Check

AUX13

Position 2

Positioning

Start Check

Completed

Position 2

Moving

Complete

Startup

Position No.3 start signal

Advertising