2. INSTALLATION Of The SUBSTATION INTeRfACe UNIT

The N-8000RS/8010RS/8400RS can be installed in any of three ways: (1) equipment rack mounting, (2) wall

mounting, and (3) desk-top installation.

2.1. equipment Rack Mounting

A) Elevated Operating Ambient - If installed in a closed or multi-unit rack assembly, the operating ambient

temperature of the rack environment may be greater than room ambient. Therefore, consideration should

be given to installing the equipment in an environment compatible with the maximum ambient temperature

(Tma) specified by the manufacturer.

B) Reduced Air Flow - Installation of the equipment in a rack should be such that the amount of air flow required

for safe operation of the equipment is not compromised.

C) Mechanical Loading - Mounting of the equipment in the rack should be such that a hazardous condition is

not achieved due to uneven mechanical loading.

D) Circuit Overloading - Consideration should be given to the connection of the equipment to the supply

circuit and the effect that overloading of the circuits might have on overcurrent protection and supply wiring.

Appropriate consideration of equipment nameplate ratings should be used when addressing this concern.

E) Reliable Earthing - Reliable earthing of rack-mounted equipment should be maintained. Particular attention

should be given to supply connections other than direct connections to the branch circuit (e.g. use of power

strips)."

The N-8000RS/8010RS/8400RS can be mounted on the CR-273, CR-413, or standard EIA 19" Equipment rack.

For the CR-273 and CR-413 Equipment rack assembly or BU-412 Blower unit installation, read the installation

manual supplied with the rack.

Note

When installing the Blower unit and

N-8000RS/8010RS/8400RS, lay the equipment

rack down face-up to do installation work

safely. Since the Blower unit is installed from

the inside of the rack, be sure to install it first,

before mounting the other components.

2.1.1. Setting space

For maintenance works, allow much space

between the wall and Equipment rack.

Perforated panels

Equipment rack

N-8000RS/8010RS/8400RS

N-8000RS/8010RS/8400RS

50 cm

50 cm

1 m

50 cm

2.1.2. Caution when installing the unit

Do not stack up 3 Substation

interface units or more.

If 2 or more units are mounted

in the Equipment rack, be sure

to mount the perforated panel

of 1-unit size (PF-013B) or more

above and below every 2 units.

Do not block the ventilation slots in the unit’s cover.

Doing so may cause heat to build up inside the unit and result in fire.

CAUTION