System design precautions, Turning the system's power switch on, Caution when turning the power switch on – Toa N-8000 Series User Manual

Page 390: Turning the power switch on, Setting procedures

Advertising
background image

4-2

Chapter 4

SYSTEM DESIGN FLOW

1. Set a network. (Refer to

p. 5-15, p. 6-5, p. 7-8

)

Perform network settings (IP address, Default gateway, and Subnet mask) for all exchanges, Various

kinds of interface units and IP stations connected to the local network.

The following three setting methods are applicable:

For an overview of network settings, please read "Network Settings Using a PC" on the following page.

• Settings using software

• Settings using a web browser

• Settings using the multi-function station

2. Perform system settings. (Refer to

p. 5-19

)

Use the supplied N-8000 Setting Software program to perform individual settings related to the system

such as the Exchange, Various kinds of interface units, Station, Paging, etc.

Here, settings are performed using a PC.

For an overview of system settings, please read "System Setting Items and Default.

(Refer to

p. 4-5

)

3. Save the settings and upload to the units. (Refer to

p. 5-126

)

Save the setting contents and write them into the Exchange, Various kinds of interface units, and IP

stations.

1. SYSTEM DESIGN PRECAUTIONS

System and equipment settings must be performed before operating the N-8000 Series systems.

Three different methods are available for individual settings, and the details of these methods are explained in

each of the following chapters.

• Settings using software (Chapter 5. System Settings Using Software)

• Settings using a web browser (Chapter 6. System Settings Using a Browser)

• Settings using the multi-function station (Chapter 7. System Settings Using the Multi-Function Station)

2. TURNING ThE SYSTEM'S POWER SWITCh ON

To perform system settings, the power supply needs to be connected to the system.

2.1. Caution When Turning the Power Switch On

Check the following to be sure before turning the power switch on:

Cables and connectors are correctly wired and connected.

The functional earth of Exchanges and Various kinds of interface units is correctly grounded.

2.2. Turning the Power Switch On

Follow the procedures below to turn the power switch on.

Step 1. Turn the power switches on of the network equipment connected such as switching hubs, router, etc

on.

Step 2. Turn all exchanges', Various kinds of interface units' and IP stations' power switches on.

3. SETTING PROCEDURES

Advertising