Tracking factor a/b – Yokogawa GC8000 Process Gas Chromatograph User Manual

Page 113

Advertising
background image

<1. Overview>

1-86

IM 11B08A01-01E

The following table shows processing designation of peak individual settings for the tracking
(correction) target.

Processing designation

Tracking

specifi cation

Tracking

(correction)

items

Stream type

Concentration

calculation

Type

Details

Peak processing External Tertiary No tracking

Tracking

Standard*1

Gate ON time

Gate OFF time

Calibration,

Measurement,

Validation

Standard

External straight

line

Calibration,

Measurement,

Validation

Indirect method

Calibration,

Measurement,

Validation

Standard,

Correction area

fraction

Calculation

processing

Base level

No tracking

Tracking

Operation time

Calibration,

Measurement,

Validation

*1

“No tracking” or “Tracking” is settable for tracking specifi cation when the gate processing method is “Zone gate.” Only the setting
for zone gate head peak becomes valid for tracking specifi cation.

11/03/22

15:15:45

Peak Setup-Specifi c (4/5)

Stream #1 Peak #1

External 3rd

> - Auto tracking req

Tracking std

- Peak std time

100.0 s

- Tracking coef a

1.0

- Tracking coef b

0.0

Menu Copy1 Copy2

Atm

Strm# Peak#

F1

F2

F3

F4

F5

F6

Figure 1.44

Tracking specifi cation and tracking factor a/b in peak individual setting (GC-HMI

EtherLCD)

Tracking factor a/b

Tracking factor a/b is a factor to perform correction of gate ON/OFF time and operation time of
base level processing by straight-line approximation. When the tracking factor b is 0, proportional
correction by tracking factor a is performed.
--------------------------------------------------------------------------------------------------------------------------------
Gate ON time after tracking = Gate ON time × Tracking factor a + Tracking factor b
Gate OFF time after tracking = Gate OFF time × Tracking factor a + Tracking factor b
Base level operation time after tracking = Base level operation time × Tracking factor a + Tracking
factor b
--------------------------------------------------------------------------------------------------------------------------------

Tracking factor a/b can be obtained by auto-calculation or by entering a set value.
To obtain tracking factor a/b by auto-calculation, set “Update” for “Automatic renewal of tracking
factors” of SYS method. Automatic renewal of tracking factor a/b is performed after completion of
peak detection of all the peaks for the relevant SYS method but before correction of gate ON/
OFF time and operation time of base level processing.
Refer to the following items to fi nd the details of automatic renewal of tracking factor a/b.

2nd Edition : May 11, 2012-00

Advertising