Yokogawa GC8000 Process Gas Chromatograph User Manual

Page 75

Advertising
background image

<1. Overview>

1-48

IM 11B08A01-01E

● In the case where a stream sequence change command is received during the run mode in

the stream specifi cation status (for continuous measurement) [2A2]

The measurement status is changed to the requested stream sequence status when the

measurement of the currently-measured stream is completed.

In this case, the operation mode remains unchanged from the run mode.

Run

W4

W5

W6

S6

W1

S1

S5

S4

W4

W5

S4

[2A2]

Time

Stream specification 1 (Continuous)

Stream sequence 2

Assinning stream sequence 2

● In the case where a stream sequence change command is received during the run mode in

the stream specifi cation status (for N times of measurement) [3A2]

The measurement status is changed to the requested stream sequence status when the

Nth round of the measurement of the currently-measured stream is completed.

In this case, the operation mode remains unchanged from the run mode.

Stop

Run

W4

W5

W6

S6

W1

S1

W1

S1

S5

S4

W4

W5

S4

[3A2]

Time

Stream specification 1 (Twice)

Stream sequence 2

Assinning stream sequence 2

Run command

● In the case where a stream sequence change command is received during the pause mode

in the stream specifi cation status [2A6]

The measurement status is immediately changed to the requested stream sequence status.
In this case, the operation mode changes to the stop mode and valves are all closed (turned

off).

Run

[2A6]

Time

Stream specification 1

Stream sequence 2

Assinning stream sequence 2

Stop

● In the case where a stream sequence change command is received during the stop mode in

the stream specifi cation status [2A1]

The measurement status is immediately changed to the requested stream sequence status.
In this case, the operation mode remains unchanged from the stop mode.

[2A1]

Time

Stream specification 1

Stream sequence 2

Assinning stream sequence 2

Stop

2nd Edition : May 11, 2012-00

Advertising