<2. Installation, Piping, and Wiring>

2-2

IM 11B08A01-01E

Unit: mm

Right side

Ventilation

opening

Carrier gas

cylinder

Piping and wiring

inlet

Drain pipe

outlet

Standard gas cylinder

Floor plan A - A’

Front

1600

1600

Window to let in

natural light

Analyzer

Standard gas

cylinder

A

A’

Rear

Figure 2.1

Example of analyzer house

(3) Unpacking

WARNING

• The GC8000 weighs about 100 to 220 kg. Unpack it near the installation site. Use a

transportation machine to move it. Handle it carefully to prevent it from falling.

• Up to two protection system may be included, each of which weighs approximately 7 kg, are

installed on top of the GC8000. Therefore, the center of gravity is higher than the center of
the analyzer body.

(4) Checking equipment

Check that the equipment has not been damaged during transportation. Contact Yokogawa if any
damage is found. Keep the packing such as crates.

Model and Suffi x Codes

Check that the model and suffi x codes on the data plate on the left side of the GC8000 match
those on the order sheet. Refer to “1.6 Data Plate.”

Accessories

Check the accessories listed in Table 2.1 and Table 2.2.

2nd Edition : May 11, 2012-00