Yokogawa GC8000 Process Gas Chromatograph User Manual

Page 77

Advertising
background image

<1. Overview>

1-50

IM 11B08A01-01E

● In the case where a stream specifi cation change command (for N times of measurement)

is received during the run mode in the stream specifi cation status (for N times of
measurement) [3C2]

The measurement status is changed to the requested stream specifi cation status (for N

times of measurement) when the Nth round of the measurement of the currently-measured
stream is completed.

In this case, the operation mode changes from the run mode to the stop mode when the Nth

round of the specifi ed measurement is completed.

Stop

Stop

Run

W4

W1

S1

W1

S1

W1

S1

S4

W4

S4

[3C2]

Time

Stream specification 1 (3 times)

Stream specification 4 (Twice)

Assinning stream specification 4 (Twice)

Run command

● In the case where a stream specifi cation change command is received during the stop

mode in the stream specifi cation status [2B1]

The measurement status is immediately changed to the requested stream specifi cation

status.

In this case, the operation mode remains unchanged from the stop mode.

[2B1]

Time

Stream specification 1

Stream specification 4

Assinning stream specification 4

Stop

● In the case where a stream specifi cation change command is received during the pause

mode in the stream specifi cation status [2B6]

The measurement status is immediately changed to the requested stream specifi cation

status.

In this case, the operation mode changes to the stop mode and valves are all closed (turned

off).

Run

[2B6]

Time

Stream specification 1

Stream specification 4

Assinning stream specification 4

Stop

● In the case where a stop command is received during the run mode in the stream

specifi cation status (for continuous measurement) [2E2]

The operation mode is immediately prepared to be changed to the stop mode.
The operation mode changes to the stop mode in the stream specifi cation status (for

continuous measurement) when the measurement of the currently-measured stream is
completed.

The stop command can be canceled with a cancel command until the operation mode

changes to the stop mode.

2nd Edition : May 11, 2012-00

Advertising