5) pressure switch for carrier gas, Replacement parts – Yokogawa GC8000 Process Gas Chromatograph User Manual

Page 372

Advertising
background image

<6. Maintenance>

6-19

IM 11B08A01-01E

<Replacement Parts>

K9630TU

Solenoid valve for the control unit electronics section

F0616.ai

Solenoid valve of the oven electronics section

Figure 6.16

(5) Pressure Switch for Carrier Gas

(1) Stop the operation and the supply of power.
(2) Stop the supply of carrier gas.
(3) Remove the cover of the electronics section located at the right side of the oven unit by

removing the six screws with a hexagon wrench included in the accessory kit (Take care not
to get the cover upside down).

(4) Disconnect the connector at the end of the cable for the pressure switch from the oven CPU

board.

(5) Remove the cover by removing the two screws of the pressure/fl ow control section.
(6) Pull the carrier gas line (1/16″ piping) off the pressure/fl ow control section side of the oven

unit.

Then, remove the nut on the electronics section side of the oven unit and remove the
pressure switch.

(7) Install a new pressure switch in the reverse order of step (6).
(8) Reconnect the connector at the end of the cable of the pressure switch to its original

location.

(9) Firmly tighten all the six screws for the cover of the electronics section of the oven unit to

maintain explosionproof condition.

(10) Close the over of the pressure/fl ow control section of the oven unit.

<Replacement Parts>

K9630LA
K9803VJ (for

ATEX)

2nd Edition : May 11, 2012-00

6

Advertising