<2. Installation, Piping, and Wiring>

2-4

IM 11B08A01-01E

3

6

2

17

13

4

18

12

15

14

9

7

10

8

11

1

16

5

Figure 2.2

Accessory kit

Note:

Table 2.2

Item

Parts number

Quantity

Remark

Coil over wrench for LSV

L9827EA

1

Seal kit for LSV

K9402VG

number of LSV

Seal kit for LSV

K9402VH

number of LSV

Ferrule

J9218VU

1 set

Ferrule

J9218VT

1 set

Cutter

J9218VV

1

User’s manual (CD)

1

IM 11B08A01-51E

Operation data

1

(5) Installation

Use anchor bolts to secure the self-standing type analyzer on the fl oor.
Use nuts and bolts to secure the wall-mounted type analyzer on the wall. The wall construction
has to be designed for four times the weight of the analyzer.
For the hole for installation, refer to “1.2 External Dimensions.”

2.1.2 Installing

Auxiliary

Hardware

(1) Cylinders

The following conditions must be met:

(a) Located near the analyzer or the external sampling system.
(b) Not subject to rainfall or direct sunlight
(c) Ambient temperature: 0 to 40°C
(d) The place should be well-ventilated so that leaking gases, if any, do not accumulate.

Comply with regulations for high-pressure gases.

(2) Other items

(a) Dehumidifi er
Provide a dehumidifi er between the carrier gas cylinders and the analyzer (as near the

analyzer as possible).

2nd Edition : May 11, 2012-00