(2) Stop the supply of power.

CAUTION

The isothermal oven is extremely hot after turning off the power immediately. Keep the purging
air supplied for more than an hour after turning off the power. Keep hands away from the oven
components.

(3) Turn off the supply of the purging air. Remove the tubes connected to ports IN, OUT1,

OUT2, and OPEN. When removing the tubes, put labels on them for ease of identifying the
connections later (see Figure 6.49 and Figure 6.50).

(4) Remove the two screws.
(5) Install a new pneumatic valve for actuating the external air supply in the reverse order of

steps (3) and (4).

(6) Confi rming that the piping is correct and there are no leaks.
(7) After completing the piping, follow the steps below.

(a) After fully opening each of the needle valves, rotate it back two turns and lock them.
(b) Feed air and make sure that air comes out from point (1) but not from point (2).
(c) Actuate valve SV11 and make sure that air comes out from (2) but not from (1).
(d) Repeat steps (b) and (c) and confi rm that the reaction times at (1) and (2) do not take more

than 0.5 seconds, with respect to the actuation of SV11.

(e) If the reaction time at (1) was more than 0.5 seconds as a result of step (d), open the EHX1

needle valve by 1/4 turns and check the delay again. If the reexamination still shows the
same result, repeat this step.

(f) If the reaction time at (2) was more than 0.5 seconds as a result of step (d), open the EHX2

needle valves by 1/4 turns and check the delay again. If the reexamination still shows the
same result, repeat this step.

<Replacement Parts>

K9193NX
K9193NY
K9193NT
K9193NU

OPE.

EXH1

EXH2

IN

OUT1

OUT2

OUT2

OUT1

IN

EXH2

EXH1

OPE.

K9193NX

(K9193NY)

K9193NT

(K9193NU)

Figure 6.49

Pneumatic Valve for Actuating External Air Supply