Yokogawa GC8000 Process Gas Chromatograph User Manual

Page 70

Advertising
background image

<1. Overview>

1-43

IM 11B08A01-01E

Run

W4

W1

W2

S2

S1

S4

W4

S4

[1C2]

Time

Stream sequence 1

Stream specification 4 (Twice)

Assinning stream specification 4 (Twice)

Stop

● In the case where a stream specifi cation change command is received during the pause

mode in the stream sequence status [1B6]The measurement status is immediately changed
to the requested stream specifi cation status.

In this case, the operation mode changes to the stop mode and valves are all closed (turned

off).

Run

[1B6]

Time

Stream sequence 1

Stream specification 4

Assinning stream specification 4

Stop

● In the case where a stream specifi cation change command is received during the stop

mode in the stream sequence status [1B1]

The measurement status is immediately changed to the requested stream specifi cation

status.

In this case, the operation mode remains unchanged from the stop mode.

[1B1]

Time

Stream sequence 1

Stream specification 4

Assinning stream specification 4

Stop

● In the case where a stop command is received during the run mode in the stream sequence

status [1E2]

The operation mode is immediately prepared to be changed to the stop mode.
The operation mode changes to the stop mode in the stream sequence status when the

measurement of the currently-measured stream is completed.

The stop command can be canceled with a cancel command until the operation mode

changes to the stop mode.

Run

W3

W1

W2

S2

S1

[1E2]

Time

Stream sequence 1

Stop command

Stop

2nd Edition : May 11, 2012-00

1

Advertising