Yokogawa GC8000 Process Gas Chromatograph User Manual

Page 89

Advertising
background image

<1. Overview>

1-62

IM 11B08A01-01E

• When calibration (or validation) is completed for all the streams specifi ed for the selected

calibration (or validation) number, the measurement status returns to the status before the
calibration (or validation). The operation mode after calibration (or validation) is determined
as follows depending on the measurement status and the operation mode before the
calibration (or validation).

Measurement status and operation mode before calibration (or

validation)

Operation mode after

calibration (or validation)

Stream sequence/Stream specifi cation (for continuous measurement), Run

Run

Stream specifi cation (for N times of measurement), Run

Stop

Stream sequence/Stream specifi cation (for continuous measurement)/

Stream specifi cation (for N times of measurement), Stop

Stop

Stream sequence/Stream specifi cation (for continuous measurement)/

Stream specifi cation (for N times of measurement), Pause

Stop

Users at Level B or higher are allowed to stop calibration (or validation).

F0128.ai

Figure 1.28

An example of the calibration (validation) method window on the GCM operation status

screen on the GC-HMI analyzer operation display

2nd Edition : May 11, 2012-00