1 wiring and piping diagram – Yokogawa GC8000 Process Gas Chromatograph User Manual

Page 29

Advertising
background image

<1. Overview>

1-2

IM 11B08A01-01E

1.1

Wiring and Piping Diagram

Vent line
(1/8 inch 316SS pipes
for standard,
1/4 inch teflon tube
for FID/FPD)

Without Vent stack

50A
SGP, STPG

15A SPG, STPG

Vent stack

50A
SGP, STPG

15A

SPG,

STPG

Vent stack

ID:10mm

or more

Vent header

(Both ends are
Rc1/2 or 1/2NPT)

Liguid sample

50A

Water

seal

pot

15A SPG, STPG

Drain

*7
Drain tank

*4 *6

Analyzer base
sampling unit
(Depends on specifications)

Calibration standard

sample

Dehumidifer

Combustion air for FID/FPD
(400 to 700 kPa)

Instrument air
(350 to 900kPa)

(Spare)

(Spare)

Carrier gas

Grounding resistance 100Ω or less

Ethernet communication *10

Power

Serial communication (RS-422) *10

Analog input (4 to 20mA/1 to 5V DC), up to 16 *10
Contact input (5V DC, 20mA DC or more), up to 32

Analog output (4 to 20mA DC)
Channel isolation or System isolation, up to 32
Contact output (AC or DC), up to 20 *10

Air output for Stream swiching valve
(350 kPa), up to 8

Air output for
Atomospheric balance
valve (350 kPa)

Contact output for System alarm 1

Contact output for Annunciator

*1

*2

*8

*5

*9

*3

*4

*4

Combustion gas or
Make-up gas for FID/FPD

With Vent stack

Sample

Sample

Using a water

seal pot

Using a drain

tank

*1: The

specifi cation determines the number of Explosion proof enclosures. No enclosures is needed for FM-Y

type.

*2: If an analyzer base sampling unit is provided, most applications require no external sampling equipment.

In addition, optimum sampling systems are prepared depending on various conditions. (For details, consult
Yokogawa. Optimal sampling systems will be offered.)

*3: For air purge piping, use stainless steel pipe of 1/2 inch or more.
*4: Power and contact output for system alarm 1 or annunciator are connected to control unit in case of FM-Y

type.

*5: Dehumidifi er can be optionally provided by Yokogawa. Other wiring cables, piping and installation materials

should be supplied by the user.

*6: Circuit breaker (30 AT or less) shall be suitable for the item of the power supply described in the

specifi cation, and located near the analyzer.

*7: Drain tank is needed only for GCs using FID/FPD. This is not used for GCs using TCD.
*8: Fix venting pipes properly so that the load of the venting pipes does not apply to the assembling vents of

this analyzer.

*9: The number of streams including one for calibration standard sample is as follows, in case of using GCSMP.

Type 1: Maximum of 7

Type 2: Maximum of 4

*10: Signal interrupters (disconnects) are required depending on the specifi cation.

2nd Edition : May 11, 2012-00

Advertising