Test run checklist, 12 test run checklist – Yaskawa Z1000 AC Drive HVAC User Manual
Page 148
4.12 Test Run Checklist
Review the checklist before performing a test run. Check each item that applies.
No.
Checklist
Page
1
Thoroughly read the manual before performing a test run.
–
2
Turn the power on.
3
Set the voltage for the power supply to E1-01.
Check the items that correspond to the control mode being used.
WARNING! Sudden Movement Hazard. Ensure start/stop and safety circuits are wired properly and in the correct state before energizing
the drive. Failure to comply could result in death or serious injury from moving equipment. When programmed for 3-Wire control, a momentary
closure on terminal S1 may cause the drive to start.
No.
Checklist
Page
V/f Control (A1-02 = 0)
4
Select the best V/f pattern according to the application and motor characteristics.
–
5
Perform Rotational Auto-Tuning for V/f Control if using Energy Saving functions.
Open Loop Vector Control for PM (A1-02 = 5)
6
Perform Auto-Tuning as described.
4.12 Test Run Checklist
148
YASKAWA ELECTRIC TOEP YAIZ1U 03A YASKAWA AC Drive – Z1000 User Manual