Electrical test, 6200t total sulfur analyzer setup menu – Teledyne 6200T - Sulfides Analyzer User Manual
Page 133
6200T Total Sulfur Analyzer
Setup Menu
Teledyne Analytical Instruments
133
5.9.5. Electrical Test
The electrical test function creates a current, which substitutes the PMT signal, and
feeds it into the preamplifier board. This signal is generated by circuitry on the pre-
amplifier board itself and tests the filtering and amplification functions of that assembly
along with the A/D converter on the motherboard. It does not test the PMT itself. The
electrical test should produce a PMT signal of about 2000 ±1000 mV.
Access the Electrical Test from the DIAG Menu (refer to Figure 5-16), then press:
DIAG
SIGNAL I / O
PREV
NEXT
JUMP
ENTR
EXIT
DIAG ELEC
RANGE = 500.0 PPB SO2 =XXX.X
<TST TST>
EXIT
Press NEXT until…
DIAG
ELECTRICAL TEST
PREV NEXT
ENTR
EXIT
Press TST until…
DIAG ELEC
PMT = 1732 MV
SO2=X.XXX
<TST TST>
EXIT
While the electrical test is
activated, PMT should equal:
2000 mV ± 1000 mV
Figure 5-31:
DIAG – Electrical Test