Electrical test, 6200t total sulfur analyzer setup menu – Teledyne 6200T - Sulfides Analyzer User Manual

Page 133

Advertising
background image

6200T Total Sulfur Analyzer

Setup Menu

Teledyne Analytical Instruments

133

5.9.5. Electrical Test

The electrical test function creates a current, which substitutes the PMT signal, and
feeds it into the preamplifier board. This signal is generated by circuitry on the pre-
amplifier board itself and tests the filtering and amplification functions of that assembly
along with the A/D converter on the motherboard. It does not test the PMT itself. The
electrical test should produce a PMT signal of about 2000 ±1000 mV.

Access the Electrical Test from the DIAG Menu (refer to Figure 5-16), then press:

DIAG

SIGNAL I / O

PREV

NEXT

JUMP

ENTR

EXIT

DIAG ELEC

RANGE = 500.0 PPB SO2 =XXX.X

<TST TST>

EXIT

Press NEXT until…

DIAG

ELECTRICAL TEST

PREV NEXT

ENTR

EXIT

Press TST until…

DIAG ELEC

PMT = 1732 MV

SO2=X.XXX

<TST TST>

EXIT

While the electrical test is

activated, PMT should equal:

2000 mV ± 1000 mV

Figure 5-31:

DIAG – Electrical Test

Advertising