6200t total sulfur analyzer troubleshooting – Teledyne 6200T - Sulfides Analyzer User Manual

Page 273

Advertising
background image

6200T Total Sulfur Analyzer

Troubleshooting

Teledyen Analytical Instruments

273

PMT Housing End Plate

This is the entry to the PMT Exchange

PMT Preamp PCA

High voltage Power Supply

(HVPS)

PMT

PMT Cold Block

Connector to PMT

Pre Amp PCA

12V Power

Connector

Cooling Fan

Housing

TEC Driver PCA

PMT Heat Exchange Fins

Light from Reaction

Chamber shines

through hole in side

of Cold Block

Insulation Gasket

PMT Power Supply

& Aux. Signal

Connector

PMT Output

Connector

Thermo-Electric Cooler

(TEC)

PMT Temperature

Sensor

O-Test LED

Figure 12-16: PMT Assembly - Exploded View

To replace the PMT, the HVPS or the TEC:

1. Remove the sensor module as described in Section 12.7.2.1.

2. Remove the entire sensor module assembly from the.

3. Remove the reaction cell assembly.

4. Remove the two connectors on the PMT housing end plate facing towards the front

panel.

5. Remove the end plate itself (4 screws with plastic washers).

6. Remove the desiccant bags inside the PMT housing.

7. Along with the plate, slide out the OPTIC TEST LED and the thermistor that

measures the PMT temperature.

 Both may be coated with a white, thermal conducting paste. Do not

contaminate the inside of the housing or the PMT tube with this grease.

8. Unscrew the PMT assembly. It is held to the cold block by two plastic screws.

 Because the threads of the plastic screws are easily damaged it is highly

recommended to use new screws when reassembling the unit.

9. Carefully take out the assembly consisting of the HVPS, the gasket and the PMT.

10. Change the PMT or the HVPS or both, clean the PMT glass tube with a clean, anti-

static wipe and DO NOT TOUCH it after cleaning.

Advertising