Teledyne 6200T - Sulfides Analyzer User Manual

Page 263

Advertising
background image

6200T Total Sulfur Analyzer

Troubleshooting

Teledyen Analytical Instruments

263

12.7.2.1. Removing and Reinstalling the Sensor Module

Several of the procedures in this section either require the sensor module to be removed
from the instrument or are easier to perform if it has been removed.
To remove the Sensor Module:

1. Turn off the instrument power.

2. Open the top cover of the instrument:

 Remove the set screw located in the top, center of the rear panel.
 Remove the screws fastening the top cover to the unit (four per side).
 Lift the cover straight up.

3. Disconnect the sensor module pneumatic lines (refer to Figure 12-6

 Gas inlet line: 1/8” black Teflon line with stainless steel fitting.
 Gas outlet line: 1/4” black Teflon

line with brass fitting.

4. Disconnect all electrical wiring to the Sensor Module:

 UV lamp power supply wiring
 Shutter cabling
 Reaction cell thermistor wiring (yellow)
 Reaction cell heater wiring (red)
 UV detector wiring
 TEC power cable
 PMT wiring (connectors J5 & J6 on the PMT preamplifier PCA)

5. Remove the three sensor module mounting screws.

Sample

Chamber

PMT

Housing

Mounting

Screw

Mounting
Screw

Mounting
Screw

Figure 12-7:

Sensor Module Mounting Screws

Follow the above steps in reverse order to reinstall the sensor module.

Advertising