Part 1 Specification

Chapter 3 Gateway R unit

81

Part 1 Specification

3.8 I/O Signals

3.8.1 I/O Signal Timings

To operate the ROBO Cylinder using the PLC’s sequence program, a given control signal is turned ON. The maximum

response time after the signal turns ON until the response (status) signal is returned to the PLC is calculated by the formula

below:

Maximum response time (msec) = Yt + Xt + 2 x Mt + Command processing time (operation time, etc.)

Mt = 10 (msec) x (n + 1) : SIO link (Modbus) cycle time

n:

Number of controlled axes

Yt: Master station o remote I/O station transmission delay time

Xt: Remote I/O station o master station transmission delay time

For the master station o remote I/O station transmission delay time (Yt) and remote I/O station o master station transmission

delay time (Xt), refer to the operation manuals of the CC-Link master unit and the PLC installed in the master unit.

(Note) If a communication error occurred due to a problem along the transmission path, etc., communication will be retried

(by up to three times) and consequently the SIO link cycle time (Mt) may become longer than normal.

Field network transmission delay time

PLC sequence program

Control signal

Status signal

Master station o remote I/O station

transmission delay time (Yt)

Remote I/O station o master station

transmission delay time (Xt)

Gateway

Control signal

Status signal

SIO link cycle time

Controller

Control signal

Status signal

SIO link cycle time

Command

processing time