Part 2 startup chapter, Caution – IAI America REXT User Manual

Page 283

Advertising
background image



Part 2 Startup Chapter

Chapter 2 Mounting and Installation

259

Part 2 Startup Chapter

(red)

(black)

24-V power supply

Extension unit

GatewayR unit

24-V power supply

Terminal resistor

(7) The terminal resistor supplied with the Gateway R unit is not used (not installed to the ROBONET controller).

Install the 220-: terminal resistor supplied with the controller link cable to the 4-way junction at the end of the SIO link.

(8) Use twisted pair cables to connect the power supply (+24 V, 0 V) to the unit positioned at the far left in each ROBONET

stage and also to the controller connected via the external SIO link (ERC2-SE or PCON-CF). The power rise timing

should be the same for each ROBONET stage and the controller connected via the external SIO link.

*1 The SCON power supply is specification single-phase 100 or 200 V.

Example of supplying power from multiple power supplies

Caution

1. Use a common 0-V line for the power supply connected to each ROBONET stage and the controller connected via the

external SIO link.

2. Keep the total distance of internal SIO communication lines of the ROBONET system (distance from the Gateway R unit

to the terminal resistor of the last controller) (including the external SIO link) to 30 m or less.

-283-

Advertising
This manual is related to the following products: