Part 2 startup chapter – IAI America REXT User Manual

Page 267

Advertising
background image



Part 2 Startup Chapter

Chapter 2 Mounting and Installation

243

Part 2 Startup Chapter

a. AC solenoid valves, magnet switches and relays

Measure --- Install a surge killer in parallel with the coils.

b. DC solenoid valves, magnet switches and relays

Measure --- Install a diode in parallel with the coils. Determine an appropriate diode capacity according to the load capacity.

In a DC system, connecting the diode in reverse polarities may damage the

diode, internal controller parts and DC power supply. Exercise due caution.

Surge killer

Keep the wiring length from each coil to a minimum.

If the surge killer is installed on a terminal block, etc., an

extra distance from the coils will reduce the noise

elimination effect.

-267-

Advertising
This manual is related to the following products: