Part 2 startup chapter – IAI America REXT User Manual

Page 310

Advertising
background image



Part 2 Startup Chapter

Chapter 5 Network Setup

284

Part 2 Startup Chapter

5.1.4 Operating Procedures

(1) Loading the parameters

This tool establishes communication with the Gateway R unit when the parameters are loaded. Accordingly, always load

the parameters if the tool or Gateway R unit has been restarted.

[1]

Click the

Load button. When a message box appears, asking if you want to permit a parameter load, select Yes

to load the parameters.

[2]

When all parameters have been loaded, a message box appears to inform you of the completion of load. Click

OK.

[3]

If the tool has failed to load the parameters, the following message appears.

-310-

Advertising
This manual is related to the following products: