Part 1, Specification – IAI America REXT User Manual

Page 85

Advertising
background image

Part 1

Specification

“Push operation”

This field defines the maximum distance traveled from the target position in push

operation.

Consider the mechanical variation of the work part and set an appropriate positioning band

so that the positioning will not complete before the actuator contacts the work part.

When the load is contacted, push operation is deemed complete

Speed

and the position complete signal turns ON.

Push

speed

Positioning band

(Maximum distance traveled in push operation)

Target position

(8) Zone+/-

These fields define the zone within which the zone output signal turns ON.

A separate zone can be set for each target position.

Only the zone setting for the currently executed position number becomes effective, and the

zone settings for all other position numbers remain ineffective.

[Rotary actuator in the index mode]

Zone signal ON area

Set values

Set values

Zone setting+: 315

Zone setting+: 70

Zone setting-: 70

Zone setting-: 315

P

ar
t 1

S

p

ec
if

ic

atio

n

Ch
apt

er
3

G

atew

ay
R

u

n

it

-85-

Advertising
This manual is related to the following products: