Part 1 specification – IAI America REXT User Manual

Page 127

Advertising
background image

0

Part 1 Specification

Chapter 3 Gateway R unit

103

Part 1 Specification

[1]

[2]

[3]

[4]

(6) Operation in solenoid valve mode 1

Enter position data beforehand in the position table of the controller, and specify each desired position number using the

corresponding link register on the PLC.

ڦ

Operation

[1] After confirming that the position complete (PEND) signal is “1” (ON), turn the ST* signal corresponding to the

position number under which the target position you want to move the actuator to, which is currently stored in a

command position number register, from “0” (OFF) to “1” (ON).

[2] The actuator starts moving, and then PEND turns “0” (OFF) tdpf thereafter.

[3] When the remaining travel becomes within the specified positioning band (INP), PEND turns “1” (ON) and the

position achieved (PE*) signal is output.

Accordingly, when checking if the position achieved (PE*) signal has been output following the completion of

positioning, do so by waiting for an appropriate time (time to move remaining travel) after PEND has turned “1”

(ON).

[4] After confirming that the position achieved (PE*) signal has been output, rewrite the command position number

register to “0” or to the next command position number.

Command position number

Position complete

Position achieved

Actuator operation

*1 Yt + 2Mt + Xt d tdpf d Yt + 2Mt + Xt + 7 (ms)

Position to start

movement

Target position

-127-

Advertising
This manual is related to the following products: