Part 1 specification – IAI America REXT User Manual

Page 138

Advertising
background image



Part 1 Specification

Chapter 3 Gateway R unit

114

Part 1 Specification

* Set an appropriate time so that “T1 t 0 ms” is satisfied, by considering the scan time of the host controller.

[Explanation of Operation]

[1] Positioning operation to position 1 (100.00 mm) is performed.

[2] Upon completion of positioning to position 1, the position complete signal (PEND) turns “1” (ON). The zone signal

(PZONE) also turns “1” (ON).

The position number is changed from 1 to 2, and the start signal (CSTR) is turned “1” (ON).

[3] Once the actuator starts moving, the position complete signal (PEND) changes from “1” (ON) to “0” (OFF) and

the moving signal (MOVE) changes from “0” (OFF) to “1” (ON). Turn the start signal (CSTR) “0” (OFF) after

confirming that the PEND has turned “0” (OFF).

[4] After the actuator has moved by 50 mm, the position complete signal (PEND) turns “1” (ON) and the moving

signal (MOVE) turns “0” (OFF) again. At this time, the PLC registers the first count in the movement counter.

Next, the start signal (CSTR) is turned “1” (ON) to start the next 50-mm movement.

[5] Steps [3] and [4] are repeated hereafter.

The PLC checks the status of the zone signal (PZONE) upon completion of positioning. If the signal is “0” (OFF), the PLC

determines that this is the last work part.

If the count in the PLC does not match the zone signal status, the signal timings may not be synchronized.

[1]

[2]

[3]

[4]

[5]

Command position

Start

(CSTR)

Position complete

(PEND)

Moving (MOVE)

Actuator movement

Completed position

Speed

Position 1

Position 2

Position 1

Position 2

Position 2

Zone signal

(PZONE)

Distances from home

Time

*

-138-

Advertising
This manual is related to the following products: