13B. WCC III - MCD2 INSTALLATION GUIDE

WCC III Technical Guide

13B-5

System Requirements

To accomplish remote communications via the internet, the
following items are needed in addition to the WCC III system in
order to control the building mechanical systems:

WARNING:

The WCC III-MCD2 system is not to be used in

any application where Fire/Life/Safety is an issue.

The WCCIII-MCD2 Basic Operating

Conditions

The WCCIII-MCD2 must be kept in a clean and dry area in the
building. The ambient temperature must be between 50 and 100
°F, and the relative humidity must be kept between 0 and 90%
(non-condensing).

The WCCIII-MCD2 is primarily designed to mount on a wall.

The WCCIII-MCD2 computer requires 115 VAC power and must
remain powered at all times for proper operation and control. The
115 VAC power circuit must be separate and dedicated exclusively
to the WCCIII-MCD2 computer. An APCTM brand UPS with an
USB connection must also be connected to the to the WCCIII-
MCD2 for backup power.

A dedicated Network IP Address or Domain Name is required.

WCCIII-MCD2 Basic System

Requirements (On-Site WCCIII-MCD2

Computer)

DSL or a Cable router/switch that connects to the
internet. Or, as an alternative, an internal jobsite
IP network that does not connect to the internet,
but when using this internal jobsite IP network, the
external internet Email of alarms from the WCCIII-
MCD2 will not be possible. Also, external access
via the internet may not be possible. An Ethernet
crossover cable is supplied for standalone non-
network applications.

A fi xed static IP address or a fi xed IP domain host
name from the ISP along with a provisioning sheet
that contains other pertinent IP setup information.

Enabled port forwarding on the Firewall of the
router/switch. This is only if a Firewall is used.

An Email address that supports a SMTP
server for SENDING with a pop server for
RECEIVING Emails, and it must have “authlogin”
authentication—TLS or SSL modes are supported.

WattMaster Controls can provide an Email address
with these requirements.

An APC

TM

brand Uninterruptible Power

Supply (UPS) – 700 Watt minimum with USB
communications.

A wall mounting surface is desirable, and preferred.

A dedicated 120VAC power circuit is required.

Front End Software Requirements

(Operator Console Software)

A Microsoft Windows XP /Vista/Windows 7/
Windows 8 -based computer.

Minimum hardware specifi cation for the Microsoft
Windows XP / Vista based computer is a Pentium
IV running at 2.4 Giga Hertz with at least 1 GB
of RAM, and 10 GB of spare hard drive space. A
CDROM/DVD drive is also required for software
installation.

WCC III software package – Provided on a
CDROM (WattMaster Part # DM1WC011-01X,
were “X” = revision level), or is available via a
download on the WCC Controls website: www.
wcc-controls.com. The installation CDROM
contains the following programs:

WCC III.exe (SS5021)

WCCUTILITY.exe (SS5023)

SCUSCR.exe (SS5026)

WCC3Trendlog.exe (SS5028)

TenantReport.exe (SS5025)

TenantOverride.exe*(SS5024)

WCC3Download.exe (SS5030)

WCC3Guest.exe (SS5022)

*NOTE:

The TenantOverride.exe program is also

available as a single program installation for the
end users that are using the simplistic graphical
interface of the TenantOverride.exe screen to
locally turn on and off specifi c control points that
are applicable to the end user.

A DSL or Cable router/switch that connects to the
internet, or access to the internet via some other
method. Or, as an alternative, an internal jobsite IP
network that does not connect to the internet, but
when using this internal jobsite IP network, the
external internet Email of alarms from the WCCIII-
MCD2 may not be possible.