Power supply modules – Lenze 9400 Manual User Manual

Page 254

Advertising
background image

Power supply modules

Wiring

Terminal assignment

6

254

EDS94SPP101 EN 7.1

Mains

Terminal X111

Labelling

Description

 Fig. 6-10

L1

L2

L3

Connection of the mains phases L1, L2, L3

C

ti

f th

l id PE

d t

Connection for the supply-side PE conductor

Terminal X112

Labelling

Description

 Fig. 6-10

L1

L2

L3

Alternative connection at the bottom: mains phases L1, L2, L3

C

ti

f th

l id PE

d t

Connection for the supply-side PE conductor

Terminal data

Max. conductor cross-section

Tightening torque

[mm

2

]

[AWG]

[Nm]

[lb-in]

Device size 4:

Connection with ring

cable lug M8

50

(2 x 25)

1/0

-

8

71

SW13

Device size 5:

Connection with ring

cable lug M10

120

(2 x 50)

4/0

(2 x 1/0)

15

133

SW15

DC bus

Terminal X111

Labelling

Description

 Fig. 6-10

+UG

-UG

Connection of DC-bus voltage

Cables routed upwards

Terminal X112

Labelling

Description

 Fig. 6-10

+UG

-UG

Connection of DC-bus voltage

Cables routed downwards

Terminal data

Max. conductor cross-section

Tightening torque

[mm

2

]

[AWG]

[Nm]

[lb-in]

Device size 4:

Connection with ring

cable lug M8

70

(2 x 35)

2/0

-

8

71

SW13

Device size 5:

Connection with ring

cable lug M10

150

(2 x 70)

300 mcm

(2 x 2/0)

15

133

SW15

Advertising