Page 289: Mechanical installation arrangement of the devices, Arrange the devices in a row from left to right

Advertising
background image

Regenerative power supply modules

Mechanical installation

Arrangement of the devices

7

289

EDS94SPP101-7.1

7.5.3

Arrangement of the devices

L1
L2
L3

M

3~

M

3~

M

3~

M

3~

E94AZMR0xx4xDB

E94ARNE0xx4

E94AZEX100

E94AZPxxxxx

E94AZPxxxxx

E94AZPxxxxx

E94AZPxxxxx

...

...

+UG

-UG

+UG

-UG

+UG

-UG

+

(E94AZPP0364)

15

4

4

94ANGVR01

Fig. 7-7

Arrangement concept
E94AZMR0xx4xDB

Mains filter

E94ARNE0xx4

Regenerative power supply module
(with E94AZPP0364 installation backplane)

E94AZEX100

DC-input module

E94AZPxxxxx

installation backplane for 9400 axis module

+UG/-UG

DC bus

A DC-bus connection with regenerative power supply module has to be planned and

dimensioned taking the technical data into account.
How to arrange the devices for operation in the DC-bus connection via the DC busbars:

ƒ

Arrange the devices in a row from left to right.

ƒ

Install the supplying device on the left:
– Regenerative power supply module with assigned mains filter (in a first row),
– Input module (in the following rows).

ƒ

Install the multi drive axis controllers to the right from the highest to the lowest

power (recommendation).

ƒ

For increasing the braking power also single drive axis controllers can be integrated.

For this purpose, these axis controllers have to be equipped with the optional busbar

mounting set (E94AZJAxxx). In order to carry out multi-supply applications, consult

Lenze.