GE Industrial Solutions DV-300 DC Drive Users Manual User Manual

Page 189

Advertising
background image

DV-300 Adjustable Speed Drives

——— FUNCTION DESCRIPTION ———

6

61

2 -

Drive initialization. Max duration time: 5 s.

3 -

End of drive initialization. The Enable drive terminal (12) is L (0V).

4 -

Delay time during which the Enable drive terminal must be L (0V): 1s.

5 -

Drive enabling. Terminal 12 is H (+24V).

If at the end of the drive initialization (step 3) or during the 1s delay time the Enable

drive terminal (term. 12) is High (+24V) a fault is detected

Reg. board power up

Drive init.

Enable drive terminal (12)

H

L

t [s]

min 1 s

Figure 6.11.7.1: Drive enabling sequence: Main command = Terminals

Case b:

Main command = Digital

1 - Regulation board power-up: Enable terminal (term.12) in any state.

2 - Drive initialization. Max duration time: 5 s.

3 - End of drive initialization.

4 - Delay time during which the Enable drive terminal must be L (0V) and Enable

drive [314] = Disable ( 0 ): 1s. During this time the Process data channels setup

initialization occurs.

5 - Drive enabling. Terminal 12 is H (+24V) and Enable drive [314] = Enable ( 1 ).

If at the end of the drive initialization (step 3) or during the 1s delay time the Enable

drive terminal (term. 12) is High (+24V) and Enable drive [314] = Disable ( 0 ) a fault

is detected.

Reg. board power up

Drive init.

Enable drive terminal (12)

t [s]

min 1 s

Proc.data ch. init.

Enable drive

[314] AND

1

0

Figure 6.11.7.2 Drive enabling sequence: Main command = Digital

Advertising