10 reactors / filters, 1 ac input choke – GE Industrial Solutions DV-300 DC Drive Users Manual User Manual

Page 73

Advertising
background image

DV-300 Adjustable Speed Drives

——— WIRING PROCEDURES ———

4

29

4.10 REACTORS / FILTERS

In order to provide AC line protection from transients and high frequencies, it is necessary to insert a threephase

reactor on the AC input of the DV-300. The values here stated take into consideration the recommendation per

EN 60146-1-1, IEC 146-1-2, EN 61136-1.

The reactors can be provided by means of line reactors or an isolation transformer.

4.10.1 AC input choke

The type of the required AC input choke depends on

- the current absorbed by the AC input
- the AC input voltage
- the relative short circuit voltage
- the AC input frequency

The values stated in the following tables refer to a functioning with the connected converter rated current and

with a relative short circuit voltage of uk = 4 %. The saturation current of the reactors is 200% of the full load

current rating of the reactor.

In case of functioning with a motor having a rated current lower than the converter one it is possible to choose

the main reactor on the basis of the motor current stated on the AC input side (armature current x 0.82 x 1.05).

The reactor saturation current can also be calculated according the required motor overload.

Example: calculating the AC input choke

Motor:

Va = 400V

Ia = 80 A

P = 29.4 kW Overload 150% Ia

Converter

6KDV3110Q2A.../Q4A...

AC input current:

I

mains

= Ia · 0.82 · 1.05 = 80 · 0.82 · 1.05 = 68.9 A

AC input inductance:

0.04 . V

mains

3 . 2

. f

. I

p

mains

mains

0.04 . 400

3 . 2

. 50 . 68.9

p

L =

=

= 0.427 mH

Choke saturation
current:

I

sat

= 1.5 I

mains

= 103.3 A

Advertising