In-t – Rockwell Automation 900-TC32 Digital Temperature Controllers, Series B User Manual
Page 197

Publication 900-UM007D-EN-E - January 2011
Parameter Adjustments & Application Considerations
4-61
9. Press the O Key for at least one second to move from the Advanced
Setting function group to the Initial Setting function group.
Figure 4.131
10. Press the O Key for at least one second to move from the Initial
Setting function group to the Operation function group.
11. Press the PF Key for at least one second to move from the Operation to
the Manual Control function group.
Figure 4.132
12. Press the U or D Key to set the manual MV. (In this example, the MV
is set to 50.0%.)
Figure 4.133
Note: The manual MV setting must be saved, but values changed with key
operations are reflected in the control output immediately.
13. Press the PF Key to move from the Manual Control function group to
the Operation function group.
Figure 4.134
in-t
5
Input Type
C
25
0.0
PV/MV
C
25
50.0
C
25
100
alm