In-t, On/off control setup – Rockwell Automation 900-TC32 Digital Temperature Controllers, Series B User Manual

Page 97

Advertising
background image

Publication 900-UM007D-EN-E - January 2011

Configuration & Basic Operation

3-27

ON/OFF Control Setup

To execute ON/OFF control, configure the PID ON/OFF parameter.

EXAMPLE

Operation Procedure: Configuring the PID ON/OFF and Hysteresis Parameters

In this example, first check that the PID ON/OFF parameter is set to

onof

in the Initial Setting function group. The Setpoint and Hysteresis parameters
will also be adjusted.

1.

Press the

O

key for at least 3 seconds to move from the Operation

function group to the Initial Setting function group.

Figure 3.45

2.

Display the Input Type parameter in the Initial Setting function group.

Figure 3.46

Table 3.I — Parameters

Symbol Parameter Name and Group Location

Application

s-hc

Standard or Heating/Cooling: Initial Setting
function group

For specifying the control
method

cntl

PID ON/OFF: Initial Setting function group

For specifying the control
method

orev

Direct/Reverse Operation: Initial Setting function
group

For specifying the control
method

c-db

Dead Band: Adjustment function group

Heating/cooling control

hys

Hysteresis (heating): Adjustment function group

ON/OFF control

chys

Hysteresis (cooling): Adjustment function group

ON/OFF control

C

25

100

PV

in-t

5

Input type

Advertising