Commissioning 5-86, Fig. 5/11: finite state machine – Festo Электромотор MTR-DCI User Manual

Page 184

Advertising
background image

5. Commissioning

5-86

Festo P.BE-MTR-DCI-DN-EN en 1209a

T7* always has the
highest priority.

Switched off

S1

Controller

switched on

S4

Drive

enabled

S2

Drive

Blocked

SA1

Ready

SA5

Jog

positive

SA6

Jog

negative

SA4

Homing

is running

SA2

Positioning task

active

SA3

Intermediate stop

S5

Reaction

to faults

S6

Fault

From all

states

S4

Operation enabled

T6

TA11

TA12

TA9

TA10

TA3

TA6

TA4

TA5

TA7

TA8

TA1

TA2

T2

T5

T3

T4

T1

T7*

T8

T10

T9

S5

T11

Fig. 5/11: Finite state machine

Advertising