Yaskawa MP920 User's Manual Design User Manual

Page 386

Advertising
background image

6 System Startup

6.2.6 Transferring Definitions, Parameters, and Programs

6-56

d) Click the OK button.

The Port 2 setting procedure is completed and the Communication Process Window
will be displayed as shown below.

Ports 1 and 2 have been set up.

4. Click Save on the Toolbar to save the set data.

Advertising