Yaskawa MP920 User's Manual Design User Manual

Page 392

Advertising
background image

6 System Startup

6.2.6 Transferring Definitions, Parameters, and Programs

6-62

4. Starting CPU Operation

Once the transfer has been completed, start CPU operation, and execute the user pro-
gram according to the definitions, parameters, and programs that have been sent.

a) Right-click the XY-TABLE PLC folder and click CPU Control (C).

b) Click the RUN button in the following message box.

c) Click the Yes button in the following message box.

d) Confirm that the message box has entered RUN status, and click the Close button.

Execution of the user program will have been started by this procedure, and the CPU
Module RUN indicator will light.

e) Turn OFF pin 8 (M.RST) of the DIP switch on the CPU-01 Module to execute master

reset.

Advertising