Yaskawa MP900 Series Machine Controller for Standard Operation User Manual

Page 24

Advertising
background image

1.2 Installing the CP-717

1-11

1

2. Double-click the Total Engineering Workstation icon and check that the application

starts up correctly.

This application can also be selected and started from the Program Menu on the Start Button of your
screen.

INFO

Advertising