Yaskawa MP900 Series Machine Controller for Standard Operation User Manual
Page 409

Ladder Logic Programming
7.3.7 Creating Branch Circuits
7-42
7
4. Enter the register number for counting as an operand of the ON DELAY instruction.
5. Select the N.O. CONTACT instruction and then set the branches and the parallel con-
nections.
6. Enter a register number as the operand of the N.O. CONTACT instruction.
7. Enter the COIL instruction.
8. Enter the N.O. CONTACT instruction.
9. Enter the COIL instruction.
Branch, connection point, and parallel connection settings can be made when the cursor is on the time
1 0000
IB00000
005.00
[
T
]
1 0000
IB00000
005.00
[
T
]
MW00010
1 0000
IB00000
OB00000
1 0003
005.00
MW00010
[
T
]
1 0000
IB00000
OB00000
1 0003
IB00001
005.00
[
T
]
MW00010
1 0005
1 0000
IB00000
OB00000
1 0003
IB00001
005.00
[
T
]
MW00010
IB00002
1 0005
1 0000
IB00000
OB00000
1 0003
IB00001
005.00
[
T
]
MW00010
IB00002
1 0005
OB00001
INFO