3 svr operation, 3 svr, 3 svr operation -5 – Yaskawa MP2200 Machine Controller User Manual

Page 421: 1 ) svr execution timing

Advertising
background image

8.1 SVR Virtual Motion Module

8-5

8.1.3 SVR Operation

( 1 ) SVR Execution Timing

The SVR is processed at the beginning of the high-speed scan. SVR processing is performed in the
next scan after specification and the processing results are reflected in the monitoring parameters.

The following table gives guidelines for the processing time required for each SVR axis.

Note)Number of axes: 1 to 16 in normal running mode

The above formula does not apply when the number of axes is 0.

Servicing all 16 virtual axes of the SVR Module is started by axis according to the following
condition.

• When fixed parameter 0 (Run Mode) is set to 0 (Normal Running)

(default: 1 (not used))

„ Comparison with SVB-01/SVA-01 Simulation Mode

In the simulation mode, positioning functions are not supported, so the position data is updated to the
final target position for 1 scan. The SVR uses its positioning function to perform distribution and
refreshes the position data for every scan up to the final target position.

SVR

SVR

SVR

High-speed scan

H Drawing

Results of commands in the H
drawing are used in SVR processing
the next scan.

H Drawing

H Drawing

SVR processing results can be
monitored in the H drawing of
the same scan.

Reflected in monitoring

parameters

Reference set

SVR

processing

Command

MP2300

MP2200

NOP

35 + 14

× Number of axes (µs)

24 + 10

× Number of axes (µs)

POSING

35 + 36

× Number of axes (µs)

24 + 24

× Number of axes (µs)

INFO

Advertising
This manual is related to the following products: