3 ) zero point return (zret), A ] operating procedure – Yaskawa MP2200 Machine Controller User Manual

Page 439

Advertising
background image

8.3 Motion Commands

8-23

( 3 ) Zero Point Return (ZRET)

When a ZRET command is executed, the zero point return will be completed immediately. Position
information will not be updated.

[ a ] Operating Procedure

Note) The following position information is updated when command execution is

completed.

• Machine Coordinate Target Position (TPOS) (IL††0E) = Zero Point Offset (ABSOFF)

(OL††48)

• Target Position (CPOS) (IL††10) = Zero Point Offset (ABSOFF) (OL††48)
• Machine Coordinate System Position (MPOS) (IL††12) = Zero Point Offset (ABSOFF)

(OL††48)

• Machine Coordinate Feedback Position (APOS) (IL††16) = Zero Point Offset (ABSOFF)

(OL††48)

No.

Execution Conditions

Confirmation Method

1

There are no alarms.

Both IL††02 and IL††04 are 0.

2

The Servo ON condition.

IB††001 is ON.

3

Motion command execution has been completed.

IW††08 is 0 and IB††090 is OFF.

Execute the zero point return (ZRET) motion
command.

• Set OW††08 to 3.

Zero point return operation starts.

• IW††08 will be 3 during execution.

Zero point return operation completed.

• IB††0C5 will turn ON.

Execute NOP motion command.

• Set OW††08 to 0.

OW

08 = 3 (ZRET)

IW

08 = 3 (ZRET)

IB

090 (BUSY)

IB

098 (COMPLETE)

IB

0C0 (DEN)

IB

0C1 (POSCOMP)

IB

0C3 (NEAR)

IB

0C4 (ZERO)

IB

0C5 (ZRNC)

One scan

Advertising
This manual is related to the following products: