5 iqpump presets and functions – Yaskawa iQpump1000 AC Drive Quick Start User Manual

Page 197

Advertising
background image

n

Software (MEMOBUS) Multiplexing Setup

Wiring the Drive RS-485 Network Connections

R+ R- S+ S-

iQpump

RS-485 Network

Pump

R+ R- S+ S-

iQpump

Pump

R+ R- S+ S-

iQpump

Pump

R+ R- S+ S-

iQpump

Pump

Process Supply

Reservoir

Figure 4.20 System Overview

Perform the following steps to make the RS-485 network connections between all drives that will be multiplexed:

1.

Jumper terminals (R+ to S+) and jumper terminals (R- to S-) terminals on each individual drive according to

Figure

4.21

.

R+

S+

R-

S-

Drive X

Figure 4.21 Drive Terminal Jumpers

2.

Use shielded communication cable for steps 3 and 4 to connect the drives in a daisy chain manner according to

Figure 4.22

.

3.

Daisy chain the (R+ to S+) terminals between each drive.

4.

Daisy chain the (R- to S-) terminals between each drive.

R+

S+

R-

S-

Drive 3

R+

S+

R-

S-

Drive 2

R+

S +

R-

S-

Drive 1

Figure 4.22 Daisy Chain Three Drives

4.5 iQpump Presets and Functions

YASKAWA TOEP YAIP1W 01B YASKAWA AC Drive - iQpump1000 Quick Start Guide

197

4

Start-Up Programming & Operation

Advertising