Functional test report, Pickup verification, Timing verification – Basler Electric BE1-11m User Manual

Page 325

Advertising
background image

9424200996 Rev L

313

Step 2: Prepare to monitor the 59P-1 timings. Timing accuracy is verified by measuring the elapsed

time between a sensing voltage change and OUT1 closing.

Step 3: Connect and apply a 120 Vac, three-phase voltage source to terminals C13 (A-phase), C14 (B-

phase), C15 (C-phase), and C16 (Neutral).

Step 4: Step the A-phase voltage up to 130 volts. Measure the time delay and record the result.

Step 5: Repeat step 4 for the 5,000 ms and 10,000 ms time delay settings of Table 105. Record the

results.

Step 6: (Optional.) Repeat steps 1 through 5 for the B-phase and C-phase voltage inputs. Note: Be sure

to enable proper target for each phase being tested.

Step 7: (Optional.) Repeat steps 1 through 6 for settings group 1, 2, and 3.

Step 8: (Optional.) Repeat steps 1 through 7 for 59P-2.

Functional Test Report

Pickup Verification

Pickup Setting Range = 1 to 300 V

Pickup Accuracy =

±2% or ±1 V, whichever is greater

Dropout/Pickup Ratio = 98%

±1%

Step Pickup Setting

Low

Actual Pickup

High

Low

*

Actual Dropout

High

*

Pass/Fail

6

245.0 V

240.1 V

249.9 V 237.6 V

242.5 V

P / F

7

125.0 V

122.5 V

127.5 V 121.3 V

123.8 V

P / F

7

75.0 V

73.5 V

76.6 V

72.8 V

74.3 V

P / F

* Dropout range is calculated from the pickup setting and may need adjusted based on actual pickup.

Timing Verification

Time Delay Range = 50 to 600,000 ms

Timing Accuracy =

±0.5% or ±2 cycles, whichever is greater

Step

Time Delay Setting

Low

Actual Timing

High

Pass/Fail

4

2,000 ms

1,968 ms

2,032 ms

P / F

5

5,000 ms

4,968 ms

5,032 ms

P / F

5

10,000 ms

9,950 ms

10,050 ms

P / F

BE1-11m

Phase Overvoltage (59P) Test

Advertising