Timing verification, Figure – Basler Electric BE1-11m User Manual

Page 348

Advertising
background image

336

9424200996 Rev L

Figure 252. BESTlogicPlus Settings

Step 3: Use BESTCOMSPlus to open the Protection, Current, Instantaneous Undercurrent (37) screen

and send the low range test settings (minimum pickup setting) to the BE1-11m for your sensing
input type in Table 129.

Table 129. Pickup Test Settings

Sensing Input Type

Range

Pickup Setting

Time Delay

5 A

Low

0.5 A

0 ms

Middle

5.0 A

0 ms

High

20.0 A

0 ms

1 A

Low

0.1 A

0 ms

Middle

1.0 A

0 ms

High

4.0 A

0 ms

Step 4: Prepare to monitor the 37 function operation. Operation can be verified by monitoring OUT2

(see Figure 252).

Step 5: Connect a current source and apply 0.6 Aac to terminals D1 and D2 (A-phase). Note that IA, IB,

or IC can be used for this test. Test is conducted on IA.

Step 6: Slowly decrease the A-phase current until OUT2 closes and record pickup. Verify the 37-1

target on the front-panel display. Slowly increase the applied current until OUT2 opens and
record reset.

Step 7: Repeat step 6 for the middle and high range pickup settings for your sensing input type. Record

the results.

Step 8: (Optional.) Repeat steps 1 through 7 for settings group 1, 2, and 3.

Step 9: (Optional.) Repeat steps 1 through 8 with CT Circuit 2 as the source for protection systems

equipped with two sets of CTs. In step 5, replace D1 with F1, D2 with F2, etc.

Timing Verification

Step 1: Use BESTCOMSPlus to open the Protection, Current, Instantaneous Undercurrent (37) screen

and send the first row of test settings in Table 130 to the BE1-11m for settings group 0.

Table 130. Timing Test Settings

Pickup Setting

Time Delay

0.5 A

2000 ms

0.5 A

5000 ms

0.5 A

10000 ms

Instantaneous Undercurrent (37) Test

BE1-11m