Basler Electric BE1-11m User Manual

Page 416

Advertising
background image

404

9424200996 Rev L

Step 2: Use BESTCOMSPlus to configure the BESTlogicPlus Programmable Logic shown in Figure

271.

Figure 271. BESTlogicPlus Settings

Step 3: Prepare to monitor 66 function operation. Operation can be verified by monitoring OUT1

(Starting), OUT2 (Stopped), OUT3 (Start Blocked), and OUT4 (Start Blocked Removed). See
Figure 271. The test sequence is illustrated in Figure 272.

Figure 272. Test Sequence

Step 4: Connect a three-phase current source to terminals D1 and D2 (IA), D3 and D4 (IB), and D5 and

D6 (IC).

Step 5: Apply 10 Aac three-phase current for approximately one minute (simulate motor starting). Note

that this is the first start. Verify that OUT1 (Starting) closes and OUT2 (Stopped) opens. Start
the timer when OUT1 (Starting) closes. The timer will be stopped when OUT4 (Start Blocked
Removed) closes in step 9. The expected timing is 360 seconds.

Step 6: Remove three-phase current for approximately one minute. Verify that OUT1 (Starting) opens

and OUT2 (Stopped) closes.

OUT1 (Starting)

OUT2 (Stopped)

OUT3 (Start Blocked)

OUT4 (Stop Timer)

First

Start

Second

Start

Start

Unblocked

Current
Applied

Current
Applied

Current

Removed

Current

Removed

6 Minutes

Time Interval Setting

P0061-55

Approx.

1 minute

Approx.

1 minute

Approx.

1 minute

Approx.

3 minutes

Starts per Time Interval (66) Test

BE1-11m

Advertising