Pickup Verification (I2 Mode)

Step 1: Use BESTCOMSPlus to send the operational settings in Table 137 to the BE1-11m. Reset all

targets.

Table 137. Operational Settings (I2 Mode)

Setting

Value

BESTCOMSPlus Screen

Description

Phase CT
Ratio

1

System Parameters, Sensing
Transformers

Sets phase CT ratio to 1

Element
Mode

I2

Protection, Current,
Instantaneous Overcurrent (50-1)

Enables 50-1 function for I2 mode

Source

CT Circuit 1

Protection, Current,
Instantaneous Overcurrent (50-1)

Selects CT circuit 1 as the source

50-1 Neg
SEQ

Enabled

Target Configuration, Targets

Enables Neg SEQ target for 50-1

Step 2: Use BESTCOMSPlus to configure the BESTlogicPlus programmable logic shown in Figure 255.

Blocking is disabled.

OUT1 closes for 50-1 Trip.

OUT2 closes for 50-1 Pickup.

Fault recording is enabled.

Figure 255. BESTlogicPlus Settings (I2 Mode)

Step 3: Use BESTCOMSPlus to open the Protection, Current, Instantaneous Overcurrent (50-1) screen

and send the low range test settings (minimum pickup setting) to the BE1-11m for your sensing
input type in Table 138.

Table 138. Pickup Test Settings (I2 Mode)

Sensing Input Type

Range

Pickup Setting

Time Delay

5 A

Low

0.5 A

0 ms

Middle

5.0 A

0 ms

High

9.0 A

0 ms

1 A

Low

0.1 A

0 ms

Middle

1.0 A

0 ms

High

1.8 A

0 ms

Step 4: Prepare to monitor the 50-1 function operation. Operation can be verified by monitoring OUT2

(see Figure 255).

Step 5: Connect a current source to terminals D1 and D2 (A-phase). For a single-phase input test, I2 =

Ia / 3. Therefore, the BE1-11m should pick up at a value of three times the setting value when
applying only a single-phase input. For example, to determine the pickup current value required

BE1-11m