Timing verification – Basler Electric BE1-11m User Manual

Page 400

Advertising
background image

388

9424200996 Rev L

Step 2: Use BESTCOMSPlus to configure the BESTlogicPlus programmable logic shown in Figure 266.

Blocking is disabled.

OUT1 closes for 55 Trip.

OUT2 closes for 55 Pickup.

Fault recording is enabled.

Figure 266. BESTlogicPlus Settings

Step 3: Use BESTCOMSPlus to open the Protection, Power, Power Factor (55) screen and verify the

first row of test settings in Table 173 to the BE1-11m.

Table 173. Pickup Test Settings

Lagging Pickup

Leading Pickup

Time Delay

0.5

0.5

60,000 ms

0.99

0.05

0 ms

0.05

0.99

50 ms

Step 4: Prepare to monitor the 55 function operation. Operation can be verified by monitoring OUT1

(see Figure 266).

Step 5: Connect and apply 5 A

∠0° to terminals D1 (A-phase polarity) and D2 (A-phase non-polarity)

and a three-phase 69.28 V phase-neutral voltage source to terminals C13 (A-phase), C14 (B-
phase), C15 (C-phase), and C16 (Neutral).

Step 6: Rotate the IA angle in the leading direction until a pickup occurs. This should happen at

∠IA =

∠VA + cos

-1

(0.5) = +60

° ±0.66° (0.49 – 0.51 PF leading). Decrease the IA angle until OUT1

opens and record the reset. Reset the target.

Step 7: Rotate the IA angle in the lagging direction until a pickup occurs. This should happen at

∠IA =

∠VA – cos

-1

(0.5) =

–60° ±0.66° (0.49 – 0.51 PF lagging). Increase the IA angle until OUT1 opens

and record the reset. Reset the target.

Step 8: Verify the pickup accuracy and reset for settings as listed in Table 173. Record the results.

Pickup accuracy is ±0.01 PF or equivalently

±|cos

-1

(pickup)

– cos

-1

(pickup

±0.001)|° of the

associated angle.

Step 9: (Optional.) Repeat steps 1 through 8 for the B-phase and C-phase current inputs taking into

consideration the different current angles. Note: Be sure to enable proper target for each phase
being tested.

Step 10: (Optional.) Repeat steps 1 through 9 for settings group 1, 2, and 3.

Timing Verification

Step 1: Use BESTCOMSPlus to open the Protection, Power, Power Factor (55) screen and send the

first row of test settings in Table 2 for settings group 0.

Step 2: Prepare to monitor the 55 timings. Timing accuracy is verified by measuring the elapsed time

between a sensing voltage change and OUT1 closing.