Festo Электромотор MTR-DCI User Manual

Page 175

Advertising
background image

5. Commissioning

5-77

Festo P.BE-MTR-DCI-CO-EN en 1209a

Notes on power operation
Control of the motor torque takes place indirectly by
means of the current regulation. All specifications on
forces/torques refer to the rated motor torque (relative
to the rated motor current). The actual force at the axis
should be calculated/checked and then set with external
measuring devices during commissioning.

Note
The following settings are required for parametrizing the
power operation (see Tab. 5/22)

– power window (permitted deviation from the nominal

value ascertained by the field bus)

– speed limitation (maximum speed which the drive

should reach). Without this specification the drive
would accelerate unbraked if there is no counter force
(e. g. work item missing).

– rest time (time during which the nominal force must be

applied, before “Motion complete” is triggered)

Extend the rest time if the nominal force is already
achieved briefly due to the increased torque when start-
ing (before reaching the work item).

Power operation is prepared when the control mode is
switched over. The drive stands with the position controlled.

Advertising