B.3.1 create readiness to operate – Festo Электромотор MTR-DCI User Manual

Page 274

Advertising
background image

B. Reference – Festo Handling and Positioning Profile (FHPP)

B-56

Festo P.BE-MTR-DCI-CO-EN en 1209a

B.3.1

Create readiness to operate

T

Internal conditions

Activities of the user

T1

Drive is switched on.
A fault cannot be ascertained.

T2

Load voltage applied.
Field bus master must be higher-order controller.

“Enable drive” = 1
CCON = xxx0.xxx

1

T3

“Stop” = 1
CCON = xxx0.xx

11

T4

“Stop” = 0
CCON = xxx0.xx

01

T5

“Enable drive” = 0
CCON = xxx0.xxx

0

T6

“Enable drive” = 0
CCON = xxx0.xxx

0

T7*

Fault recognized.

T8

Reaction to fault completed, drive stopped.

T9

There is no longer a fault.
It was a serious fault.

“Quit fault” = 0

→ 1

CCON = xxx0.

Pxxx

T10

There is no longer a fault.
It was a simple fault.

“Quit fault” = 0

→ 1

CCON = xxx0.

Pxx1

T11

Fault still exists.

“Quit fault” = 0

→ 1

CCON = xxx0.

Pxx1

Key: P = positive edge, N = negative edge, x = any

Advertising